发布信息

欧洲公司需要采购自动SMC混料生产线 --20260707

作者:本站编辑      2026-07-11 11:36:51     3
欧洲公司需要采购自动SMC混料生产线 --20260707

点击蓝色字关注公众号

欧洲公司需要采购自动SMC混料生产线

We need to gather some technical and commercial proposals for setting up a paste preparation area and an automatic SMC compounding line.

需要膏体制备区和一条自动SMC混料生产线

Here are some initial data you can share with the suppliers: 

如下是一些初步的信息

Paste Preparation Area  

膏体制备区

  • Phase  1 (Initial Phase): Raw material management (loading) will be completely  manual. This phase includes producing thermoplastic solutions—to be  stored in dedicated tanks (2-3 tanks of 3.5–5 $m^3$)—and the production pastes.第一阶段(初始阶段):原材料管理(装料)将完全采用人工操作。该阶段包括生产热塑性溶液——需储存在专用储罐中(2至3个,每个容量为3.5–5立方米)—以及生产用膏体。
  • Phase  2 (Final Phase): Solution production will be fully automated. The paste  mixer will then be used for small batches or formulation fine-tuning. 第二阶段(最终阶段):溶液生产将实现完全自动化。膏体混合器则用于小批量生产或配方微调。

Required Equipment: 所需的设备

  • 1x Solution Mixer (final version, also suitable for Phase 2) – 1000L capacity 1台溶液混合器(最终版本,也适用于第二阶段)—容量1000升
  • 1x Transfer Pump 1台转移泵
  • 1x Support Frame for positioning 2-3 storage tanks (3500–5000L) 1个支撑框架,用于定位2-3个储罐(3500–5000升)
  • 2-3x Storage Tanks with agitator, made of AISI 304 stainless steel 2-3倍储罐,带搅拌器,采用AISI 304不锈钢制造
  • 1x Mixer / Disperser / Scraper for paste production 1台混合/分散/刮板机,用于膏体生产
  • 3x Stainless Steel Troughs / Bowls (1500L) with wheels and bottom discharge valve 3个不锈钢槽/碗(1500升),带轮子和底部排料阀

SMC Line SMC生产线

  • Production Line: The line should be capable of producing a sheet with a maximum width of 1600 mm. 生产线:该生产线应能够生产最大宽度为1600毫米的板材。
  • End-of-Line Equipment: It needs to be equipped with a festooner and a big-roll winder. 生产线设备:需配备花边机和大卷绕机。
  • Expected Output: The estimated annual production at this stage is around 4,000 tons/year. 预计产量:现阶段的年产量估计约为4000吨/年。

The scope of supply must include: 注意报价需要包含:

  • delivery to Italy (including transport costs), 意大利的运费(收获地址24020 - Scanzorosciate (Bergamo) Italy
  • installation at our plant, 需要在客人工厂安装
  • the commissioning and process fine-tuning phase, and 需要调试与工艺优化阶段
  • a well-structured training program for our operators.为操作人员提供一个结构完善的培训计划。

Our  goal is to receive as soon as possible complete evaluations including  all technical details, a budget indication of the various costs (both  fixed and operating costs), and the installation lead times starting  from a potential order.

I look forward to hearing from you soon. Thanks a lot

除了报价,也请告知从下单到安装的大概时间周期,

更多详细资料请联系:

联系人:Canny 

Email:jrs26@jrs-sourcing.com

电话:0755-86655575

关注深圳创业港(www.szcyg.org)每日采购信息

更多采购请见深圳创业港www.szcyg.org

相关内容 查看全部